Sea Perch Online Manual

The Vehicle Frame The Thruster Assembly
The Control Box


The Control Box
Step 5

PURPOSE:
    Finishing the control box
MATERIALS:
  • Control box
  • Wired switches
TOOLS:
  • 5/16" nut driver
  • Phillips screwdriver

PROCEDURE:
  1. Place pole switches in corresponding holes. Tighten into place with nut driver. (Fig 22A)
  2. Remove red buttons from button switches. Place button switches through the two holes next to the tether cable. Tighten with nut driver. Place red buttons back onto the switches.
  3. Screw on the back of the control box. (Fig 22C)
     
 
A. Control box with power cable, tether and pole switches

  B. Control box with completed thruster switches
   
C. Completed control box    

PREVIOUS: Step Four| NEXT: The Finished Product and Operating Instructions

Copyright 2003 MIT Sea Grant

HOME |